The core cultivation of the putting greens was originally scheduled for the week of April 13th however, with warmer temperatures, firmer surfaces and drier soil conditions the aerifcation will begin across the course on 3/30/15- 4/2/15 pending weather conditions. The practice and #1 green have been aerified to test equipment and processes of clean-up. Aerifcation is disruptive to play and takes a tremoundous amount of labor to complete properly. With that said, it is a necessary evil to reduce compaction, modify the existing soil, aiding to improve playability and the health of the turf.

Recovery time will be slower compared to the late summer cultivation practices due to cooler soil temperatures and the extended forecast models are leaning towards below normal temperatures. We anticipate at least 14-18 days for complete recovery.

Thank-you,

Pat O'Brien

Grounds Superintendent

 

 

 

Saturday, March 21, 2015

Spring is here!

It is officially Spring however, the temperatures are still slightly below normal, but the turf is off to a great start. The putting greens have been been mowed and rolled several times to smooth and firm the surfaces after a long winter. Overall, the fairways and new Zoysia continue to look healthy, the spring transition of the Zoyisa will be crucial, hoping there will not be any extreme temperatures over the next month.

What difference a week makes!
Drainage functioning and looking great!

New drainage, installed last season in greens 2,10, 11 and 16 is functioning well, root growth has been slow with the sodded lines but we will adjust our program to enhance these areas.

Over the next few weeks the staff is extremely busy with:

  • Spring clean-up of tree debris
  • Spring aeration of the putting surfaces the week of the April 13th
  • Irrigation pressurization
  • Leveling and fine tuning of bunkers
  • Mulching of landscaped areas
  • Staff recruitment and training
  • Har Tru tennis court resurfacing
  • Final preventative maintence on equipment

 