On October 17th the Grounds Staff will continue with leveling, reshaping and realigning the tees on select holes beginning with #11. During the process the existing tee will be divided into two separate tees, all bentgrass sod will be lifted and reused, along with the surrounding turf being replaced with turf type tall fescue. During this process a temporary tee will be used in front of the tee in the rough. Please see below photo of the exisiting and proposed tee placement.